B2Gold Provides Updated Life of Mine Plan for Goose Project
Indicated mineral resource estimate at the Goose project is around 3.6 million ounces of gold, or 15.5 million tonnes grading 7.16 grams per tonne gold. The gold grade is a 16% improvement from the gold grade in the last published technical report by the prior owner. Inferred mineral resource estimate is around 2.4 million ounces of gold, or 10.1 million tonnes grading 7.54 g/t gold. The gold grade is a 14% improvement versus the prior report.
The open pit and underground gold mine has an initial mineral reserve mine life of about 9 years, with mineral reserve life of mine production of about 2.3 million ounces of gold. The weighted average all-in sustaining cost of about
The mineral reserve estimate that forms the basis for the Goose project mineral reserve life of mine includes a probable mineral reserve estimate of 11.3 million tonnes grading 6.82 g/t gold for a total of 2.5 million ounces of gold.
MT Newswires does not provide investment advice. Unauthorized reproduction is strictly prohibited.
© 1999-2025 Midnight Trader, Inc. All rights reserved.

Related News
-
Talphera to Reduce Size of Renal Replacement Therapy Study, Enters Private Placement; Shares Fall
MT Newswires - 26 minutes ago
-
Tesla offers 3-year interest-free loans for refreshed Model Y in China
Reuters - 28 minutes ago
-
Market Chatter: GlobalFoundries, United Microelectronics Exploring Merger
MT Newswires - 28 minutes ago
-
Rocket to Acquire Mr. Cooper in $9.4 Billion All-Stock Deal
MT Newswires - 29 minutes ago
-
MT Newswires - 30 minutes ago
-
USA Rare Earth Opens New Innovations Lab at Oklahoma Facility
MT Newswires - 38 minutes ago
-
GlobalFoundries and Taiwanese chipmaker UMC mull potential merger, Nikkei reports
Reuters - 41 minutes ago